Selected Infrastructure & Site Development
Projects
Representative Projects across land clearing, underground utilities and municipal infrastructure
Land Clearing, Earthwork, Mass Grading & Pads
Schedule Coordination, geotech compliance, efficient sequencing
Site Preparation
6 acre Townhomes, Panama City, FL
Land Clearing, Earthwork, Mass Grading
Large Acreage
30 acre Mixed Use, Buford, GA
Land Clearing & De-bushing, remove tree stumps, parking, road base preparation, Wetlands Delineation
Smaller Projects
2 acres, Jiffy Lube, McDonough, GA
Smaller acreage clearing, grading, infill
Stormwater, Drainage & Erosion
Storm drainage systems, storm drain and pipe installs, erosion, head walls
Detention/Retention Ponds
30 acre Mixed Use, Buford GA
Storm placement, precast install, pipe, joints, access on a large scale, blasting, density tests
Storm Drains & Related
30 acre Mixed Use, Buford, GA
Storm erosion, precast installation, corrugated pipe, joint sealing, testing, Environmental oversight
Creek Crossings & Wetland Delineation
27 acres, Mixed Use Infill phase II
Wetland delineation credits for needed for crossing
Water, Sewer & Underground Utilities
Sanitary sewer, water mains and laterals, utility coordination, testing & inspections
Water & Sewer
2 acre town-home lot, Callaway FL
Storm excavating, water level depths, precast installations for sewer and water preparation
Tie-Ins, Utility Coordination
2 acre town-home lot, Callaway, FL
Storm erosion, precast installation, corrugated pipe, joint sealing, testing, Environmental oversight
Precast & Utility Coordination
2 acres Callaway, FL
Sewer precast set within ROW, fiber and cable mechanical
Water Tie in next to retention pond
Roadway, Site & Municipal Infrastructure
Emergency repairs, retaining walls, storm precast, curb, gutters and relining pipes
Emergency Road Repairs
City of Atlanta
+500LF road, gutter, ROW, access removed
Relining Storm Pipe
81 lin City of Atlanta Payee
80" Storm drain underneath road, before relining or cure, head wall rebuild, and the retaining wall is started
Head wall, relining, retaining wall
After head wall is rebuilt, pipe slotted and retaining and box started (14W x 10L x 8T)