Selected Infrastructure & Site Development Projects
Representative Projects across land clearing, underground utilities and municipal infrastructure
Land Clearing, Earthwork, Mass Grading & Pads
Schedule Coordination, geotech compliance, efficient sequencing



Site Preparation
6 acre Townhomes: Panama City, FL
​
Land Clearing, Earthwork, Mass Grading
Large acreage
30 acre Mixed Use: Buford, GA
​
Land Clearing & De-mucking, remove fill, geotech
packing, road base preparation, Wetland Delineation
erosion measures.
Smaller Projects
2 acres: Jiffy Lube: McDonough GA
​​
Smaller acreage clearing, grading, infill,
geotechnical required packing.
Stormwater, Drainage & Erosion
Storm drainage systems, storm drain and pipe installs,
erosion, head walls



Detention/Retention Ponds
30 acre Mixed Use: Buford GA
​
Storm placements, precast install, pipe, joints,
erosion on a large scale, blasting, density tests
Storm Drains & Related
30 acre Mixed Use: Buford, GA
​
Storm erosion, precast installation, corrugated pipe,
joint sealing, testing, Environmental oversight
Creek Crossings & Wetland Delineation
27 acres: Mixed Use into phase II
​
Wetland delineation credits for needed for crossing​​
Water, Sewer & Underground Utilities
Sanitary sewer, water mains and laterals, utility coordination, testing & inspections



Water & Sewer
2 acre town-home lot: Callaway FL
​
Storm excavating, laser level depths, precast
installations for sewer and water preparation
Tie-Ins, Utility Coordination
2 acre town-home lots: Callaway, FL
​​
Storm erosion, precast installation, corrugated pipe,
joint sealing, testing, Environmental oversight
Precast & Utility Coordination
2 acres Callaway, FL
Sewer precast set within ROW, fiber and cable workaround​​
Water Tie in next to retention pond

Roadway, Site & Municipal Infrastructure
Emergency repairs, retaining walls, storm precast, curb, gutter and relining pipes
%20Sidewalk%20GAB_JPG.jpg)
Emergency Road Repairs
City of Atlanta
1500LF curb, gutter, ROW, erosion measures
Relining Storm Pipe
$1.8m City of Atlanta Repair
60" Storm drain underneath road, before relining of pipe, head wall rebuild, and the retaining wall is started.
​​
Head wall, relining, retaining wall
After head wall is rebuilt, pipe relined and retaining wall has started (14'W x 120'L x 16'T)