top of page

Selected Infrastructure & Site Development Projects

Representative Projects across land clearing, underground utilities and municipal infrastructure

Land Clearing, Earthwork, Mass Grading & Pads

Schedule Coordination, geotech compliance, efficient sequencing
2022-01-13 10.45.21.jpg
June 18 2008 018.jpg
December Pics 058.jpg
Site Preparation

6 acre Townhomes: Panama City, FL

​

Land Clearing, Earthwork, Mass Grading

Large acreage

30 acre Mixed Use: Buford, GA

​

Land Clearing & De-mucking, remove fill, geotech

packing, road base preparation, Wetland Delineation 

erosion measures. 

Smaller Projects

2 acres: Jiffy Lube: McDonough GA

​​

Smaller acreage clearing, grading, infill,

geotechnical required packing.

Stormwater, Drainage & Erosion

Storm drainage systems, storm drain and pipe installs,
erosion, head walls
July 23 2008 025.jpg
June 22 2008 020.jpg
June 22 2008 009.jpg
Detention/Retention Ponds

30 acre Mixed Use: Buford GA

​

Storm placements, precast install, pipe, joints,

erosion on a large scale, blasting, density tests

Storm Drains & Related

30 acre Mixed Use: Buford, GA

​

Storm erosion, precast installation, corrugated pipe,

joint sealing, testing, Environmental oversight

Creek Crossings & Wetland Delineation

27 acres: Mixed Use into phase II

​

Wetland delineation credits for needed for crossing​​

Water, Sewer & Underground Utilities

Sanitary sewer, water mains and laterals, utility coordination, testing & inspections
2025-02-05 10.16.12.jpg
2025-03-04 12.55.24.jpg
2025-03-12 16.25.15.jpg
Water & Sewer 

2 acre town-home lot: Callaway FL

​

Storm excavating, laser level depths, precast

installations for sewer and water preparation

Tie-Ins, Utility Coordination

2 acre town-home lots: Callaway, FL

​​

Storm erosion, precast installation, corrugated pipe,

joint sealing, testing, Environmental oversight

Precast & Utility Coordination

2 acres Callaway, FL

Sewer precast set within ROW, fiber and cable workaround​​

Water Tie in next to retention pond
2025-03-28 08.19.23 crop.jpg

Roadway, Site & Municipal Infrastructure

Emergency repairs, retaining walls, storm precast, curb, gutter and relining pipes
1b) Sidewalk GAB.JPG
Emergency Road Repairs

City of Atlanta

1500LF curb, gutter, ROW, erosion measures

Relining Storm Pipe

$1.8m City of Atlanta Repair 

60" Storm drain underneath road, before relining of pipe, head wall rebuild, and the retaining wall is started.

​​

Head wall, relining, retaining wall

After head wall is rebuilt, pipe relined and retaining wall has started (14'W x 120'L x 16'T)

IMG_5644.JPG
IMG_4548.JPG
IMG_5699.JPG
bottom of page